Before
Existing fireplace has been removed.
The chimney breast face has had the render / plaster removed, reveiling the brick built chimney breast with original arch.
Stage 1
Chimney breast has been chemically cleaned with the damaged bricks removed.
The original lime mortal joints have been racked out to approximately 15-20mm.
Stage 2
The mortar joints have been re-pointed and missing bricks replaced like for like.
Various types of mortar pointing can be carried out to give different finishes.
Finished Job
New hearth has been fitted along with the clients chosen stove.
The stove is then tested and commisioned and then the client is given a full demonstration of how to use the appliance.
After this the HETAS certificate is then issued.